What the client was facing
Industrial electricity at ₹8.20/unit + 800 kVA contract demand. Factory running 3-shift operation with 180 kW connected load. Annual electricity spend exceeded ₹37 lakh.
The system we designed
200 kW rooftop captive system with 2× 110 kW Solis central inverters and bifacial panels on elevated trackless structure. Synchronized with HT panel for seamless grid interaction.
How we executed
Technical + financial feasibility (month 1). HT engineering + DTCP approval (month 2). Installation (month 3-5). HSERC net-metering + commissioning (month 6).
The numbers that matter
61% reduction in monthly electricity cost. ₹22.8 lakh annual savings. 40% accelerated depreciation saved ₹11.2 lakh in taxes (year 1). ROI including tax benefits: 3.7 years.
"Payback in under 4 years with tax benefits. Ojas managed the entire HT engineering, DTCP paperwork, and UHBVN clearance — we just signed the documents."
Ready for similar savings?
Get a free rooftop survey — our engineer will design a system tailored to your roof, load, and budget.
Book My Free Survey →More case studies
25 kW Office Solar — TechStack Coworking, Hyderabad
- Size: 25 kW
- Location: HITEC City, Hyderabad
- Annual Savings: ₹285,000
200 kW Factory Solar — Agrawal Textiles, Panipat
- Size: 200 kW
- Location: Panipat, Haryana
- Annual Savings: ₹2,280,000
10 kW Home Solar — Iyer Villa, Bengaluru
- Size: 10 kW + 10 kWh battery
- Location: JP Nagar, Bengaluru
- Annual Savings: ₹118,000